CO129-468 - Governor Sir Stubbs - 1921 [6-8] — Page 418

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All

on

707

+

----

„medeell zrodz»H

TIB

cli meddal abel to Eznod arð od so worsten AEW

Tepingnang 20ox roll to vežimomm and ne

[000,ling, MJÉI

„mand vd hayimjooo7 Kizu don medrollidieo

Holi Mol. 5.3 to esigoo trud das qua (frow I

„ÞI¤i ni bebrems a" "Col To so nabru Miqqude snadoral

or buben 10% ai m-l noiseqgat – sidzina sud to doid os f

{e}d>{sde unied se „noil ́nzolat ris 3 xe) morit

bne redeolites 19, meneng dɔir teinu

L

tort Jedrarea nettik apel seer nog alvo da Eştan

nu numbkim Et dostal riert mi Expo. els vol mel 'inf

.5[☺r mi „mimi-tjo esons of relinis nga ajmad-E [İM remmede II grew are:d 02€( team wid priz

י

E kadroitidres top mening badaeq. (Egradabiyañ) »mos 02 alm Jueganí odo. To dh is nefcum vind to, tuo : roz mell

nebo fiamm bar ISVUONNA” ́m oted unartaŭ vi e GY

- od ne vidisentuh meiḥened att yd obem aer noidratla viti[inst om gv¬d vært en sedaaitiduso nuo to vdih££¬y

notkou two adqesor Born?zej daum hre Ene start de geldoek

.cro Tis: er adgolfiðnet

to VETTUR out of bigen r'dan soldoeng Izmeu ami

‚men [[0] »n nå adebititzen zŒ ma¬rag tot re: reds uthor 31 mi sono trial de Xoob you mi boyavine ad of LINE

And den sen

0.

· Piszaader brot ti asendaidt 107 herod

Janii de noit crimers not ni mwerb ed of tîod? zellacori JI 7:37-8Tent arsey & greve ni nano teral de fer payege potiv mmaki 20 Tied maddod rani me to "é zovo mok Freest

to be renewed.

414

Diameter of shafting to be at least equal

to that stated on page 111 paragraph 195 of "Instructions 98 to the survey of Passenger steamships" issued by Board

of Trade 1913.

Hull Internally to be examined once in 12 months together with Ballast and Peak Tanks, bulkheads, frames floors, etc. Watertight doors to be examined once in 12 months to ascer- tain efficiency and worked to satisfaction of surveyor. Machinery upper brasses of all bearings to be taken off, thrust shoes taken out and covers of tunnel blocks taken off for examination of shafting cylinder covere and junk ringe lifted for examination of cylinders and pistons. The slide valve covers removed velves taken out feed and bilge pump velves removed. Air and circulating pump covers lifted, pump chambers buckets and velves opened up for examination at least once in 12 months.

Boilers all boilers to be opened up, furnace fronts bridges and firebars removed, the furnace combustion chambers, and inside of boilers to be thoroughly cleaned to permit a

If first thorough examination at least once in 12 months. survey then Hydraulic test to be applied to all boilers. Plans to be submitted of boilers in case of new ship or first survey to fix working pressure, 1920 standard rules

used.

Main steam pipes to be tested by Hydraulic pressure at least every four years to twice the working pressure. Valves and Cooks on boiler to be opened up at least once in 12 monthe for examination.

Safety Valves to be adjusted and locked to working pressure allowed after survey of boilers.

Load Line if ship has no load line issued by classification society or B of T then must be measured by B of T rules of

1909.

Boats to be thoroughly examined at least every 12 months